Skip to main content
Regulations 4 min read

Tighter Enforcement of the Energy Code at Architectural Plan Review

Recent plan reviews have paid noticeably closer attention to thermal envelope details and Part 19 documentation. Decisions about insulation and glazing belong in the design phase, not after the walls are up.

Street view of a newly built residential building

Part 19 of the National Building Regulations governs energy conservation, classifying buildings by use, climate zone and floor area. For each class, it sets a ceiling on heat transfer through walls, roofs, floors and windows. What has changed in recent months is not the requirement itself, but how closely the supporting documentation is examined during plan review.

In practice, the architectural drawings now need to show the layer build-up of the external wall, insulation type and thickness, thermal bridge details at beams and columns, and the specification of glazing and window profiles. A blanket note stating that Part 19 will be observed no longer passes, and files without these details are sent back for revision.

For an owner this cuts both ways. It raises upfront cost: proper envelope insulation and well-specified double glazing add a real figure to the budget. It also lowers heating and cooling bills for the life of the building and improves thermal comfort. The difference in internal wall surface temperature during winter is something residents notice daily.

The critical variable is when the decision is made. Changing insulation thickness on paper costs nothing; adding it after the facade is built means demolition. On projects where we handle both design and supervision, these details are fixed before the structural drawings are approved, so wall thickness, openings and floor-to-floor heights all reconcile.